| TANK
CONSTRUCTION (AUSTRALIA) |
Construction of 4 LNG Tanks. Duties involved welding of cryogenic
steel such as LT50 Carbon steel, Stainless steel, 9% Nickel steel
and Hastelloy. |
 |
|
 |
| |
|
|
| TANK
CONSTRUCTION (AUSTRALIA) |
Project involved construction of 4 Precipitation vessels. Duties involved
were to train and instruct welders on the use of horizontal girth
welding machines and flux core wire welding processes. |
 |
|
 |
| |
|
|
| TANK
CONSTRUCTION (AUSTRALIA) |
Construction of one Condensate tank, 83 meters diameter. Responsibilities
included the supervision and co-ordination of construction activities
including floor, shell plate and the floating roof. |
 |
|
 |
| |
|
|
| TANK
CONSTRUCTION (SOUTH EAST ASIA) |
Involved with the construction of 2 LNG Tanks and associated piping,
Duties include overseeing fabrication and installation of stainless
steel cryogenic pipes, direct control of welding process on pipes
and horizontal girth welding of the 9% Nickel plates used in the fabrication
of the LNG Tanks. Responsible for manpower, cranage and equipment
movements. Additional duties involve aiding pressure leak testing,
and piston air blowing of pipes. |
 |
|
 |
| |
|
|
| TANK
DEMOLITION (SOUTH EAST ASIA) |
Demolition of existing LNG Storage tank which involved supervision
of manpower, cranage and cutting procedures. Additional duties included
monitoring the high level of safety standards and procedures required
for this type of activity. |
 |
|
 |
| |
|
|
| TANK
CONSTRUCTION (MIDDLE EAST) |
|
Involved in the co-ordination and supervision for the construction
and testing of:
- Two 120,000m3
LNG tanks.
- Two 30m dia
floating roof condensate tanks
- One 14.5m
dia propane sphere
- Twelve miscellaneous
fuel and water storage tanks
- 2500m stainless
steel process piping and carbon steel utility lines.
|
 |
|
 |
| |
|
|
 |
|
 |
| |
|
|
| |
|
|